SALINAS VALLEY MEMORIAL HOSPITAL / CARDIAC CATHETERIZATION LABS
This project included: HVAC, plumbing, fire protection, medical gases, and site utilities. It was completed in 1997.
This project is a 3-story addition to an existing operating hospital. The facility includes two catheterization laboratories, one cardio vascular operating room, patient holding area, waiting areas, offices, a library, and plant support spaces.
Also included in this project was the rerouting and the replacement of kitchen waste/grease interceptor, main water line, fuel oil lines, extension of chilled water, and heating hot water from the existing building.